Skip to main content
Las Positas College

Measure A Requests

Math, Science, Engineering & Public Safety

Brief list of MSEPS Measure A priorities and analysis:

  1. CTE Programs: 3 or more separate facilities; separate from each other but not isolated from campus
    • Public Safety Training Facility
    • Viticulture Flagship Teaching Winery/Horticulture Building with Labs and Greenhouse
    • Auto/Welding
  2. Science and Engineering
    • Science Phase 1 (Bldg 1800) Renovation and expansion
    • Science Phase 2 (Bldg 1850) Renovation and expansion
    • Science Phase 3: labs, learning centers, classrooms, storage
    • Planetarium
    • Dark-sky site (Murray ranch?)
    • Field research station (Murray ranch?)
    • Maker Space
  3. Math Classrooms and Computer Labs
  4. Student Learning Center/Academic Resource Building
    • 2100/2200 or 600/800?
    • Multistory 2200 only/leave 2100 as is?
    • Keep Tutorial in 2400 or move to central building?
  5. Testing/proctoring center
  6. More parking, convenient and accessible
  7. Traffic flow-safety, delivery access, expand loop road
  8. More than one elevator per building
  9. Restrooms near 2100/2200/2300
  10. Sustainable to take down 2100?
  11. Campus culture—multiple-discipline faculty office buildings, or discipline faculty in discipline specialized buildings, or both?